We took the responsibility for the construction and finishing of 3 Main Faculty buildings. – Engineering: built-up area over 31,000 sqm. – Pharmacy: built-up area over 21,300 sqm. – Food Industry: built-up area over 17,200 sqm. in addition to the construction of 3 Main University Gates.